From first measure to handoff
Method pages spell the verbs we use on the floor—measure the wall, cut the cords, knot the panel, finish the dowel.
Method pages spell the verbs we use on the floor—measure the wall, cut the cords, knot the panel, finish the dowel.
Materials shown here are the ones we keep stocked; substitutes are named before work starts.
Day counts begin after approvals and material locks, not after the first email.
You will see what we refuse: rushed cures, over-brightening, or stitches that cannot survive a pocket.
Questions that need photos are easier by form than by phone; attach details in the message field.



How long for a custom hanging?
Most wall pieces need 14–21 days after cord and pattern notes are locked.
Can you match a photo pattern exactly?
We can work toward a structure; exact copies of another maker’s design are refused.